Aquarium calculators

Use the right aquarium calculator before you dose, stock, feed, or move a tank.

This page is the tool index. Pick the calculator that matches the decision you need to make, enter the tank numbers on that tool page, then use the result with the safety notes below.

Choose the tool by the decision

Fast route

If you are trying to…Start hereDo not skip
Dose medication or fertilizerAquarium Volume CalculatorSubtract substrate, hardscape, and empty space from nominal tank size.
Lower nitrate safelyWater Change CalculatorMatch temperature and conditioner before the change.
Add more fishFish Stocking CalculatorCheck adult size, aggression, filtration, and schooling needs.
Feed a mixed tankFish Feeding Schedule CalculatorWatch body condition and leftover food, not only the schedule.
Place a heavy tankAquarium Load-Bearing CalculatorInclude water, glass, substrate, rock, stand, and equipment.

Safety boundary

Calculator output is a planning estimate, not a guarantee. When fish are sick, water tests are unstable, or a tank is structurally heavy, use the result as a starting point and verify with real measurements.

Which number to work out first

The order matters because each result feeds the next. Doing them out of sequence is how people end up dosing a 60-litre tank as if it were 80.

  1. Water volume. Everything downstream — dosing, stocking, water changes — is a percentage of this number.
  2. Stocking load. With volume known, the stocking calculator converts fish list into a bioload percentage.
  3. Water change percentage. Nitrate movement over a week tells you whether the routine matches the load.
  4. Feeding amount. Last, not first: portion size follows from load and water stability, not from appetite.

Using two results together

A stocking result of 85% and a water change routine of 20% weekly is a mismatch — the tank will accumulate nitrate faster than the changes remove it, and the fix is either less stock or more water changed. The same logic applies to feeding: if nitrate climbs between changes at a fixed feeding amount, the amount is the variable to change first.

For the measurements behind these numbers, the water testing checklist covers which tests to run and how often, and the stocking calculator explains the bioload model itself.